Summary Schedule for Processing Transactions Prior to Oracle Release 12 Upgrade and Reporting
This is the summary schedule for all transactions and reporting deadlines prior to the Oracle Release 12 Upgrade. Please click on the Print button found at the bottom of this article if you wish to print a version for quick reference.
|
Date |
Time |
Event |
Fri. Nov. 9 |
12 p.m. |
• All Approved Reimbursements and required documentation must be received at 1033 Massachusetts Ave, 2nd floor. Any Reimbursement Requests received that do not meet the audit requirements will be returned to the Tubs and will have to be re-entered by the Tub after November 26, 2012 |
Tues., Nov. 13 |
12 p.m. |
• HCOM payments to be made in foreign currency (drafts and wires) must be entered and approved by the Tub and the related invoices must be received by AP at 1033 Mass. Ave., 2nd Floor. Please note that a wire transfer authorization form must be attached to the front of the invoice. |
5 p.m. |
• Previously approved Payment Requests with all required documentation for Standard Check Payments will be processed |
|
Wed., Nov. 14 |
12 p.m.. |
All checks that need to be voided and re-issued must be received by AP for the check to be re-issued on November 16, 2012. |
3 p.m. |
PCard sweep for transactions loaded between October 25-November 2 |
|
5 p.m. |
Non-standard check processing (Special Handling requests) received at 1033 Massachusetts Ave, 2nd floor will have a check available for distribution on November 16, 2012. |
|
Thurs., Nov. 15 |
3 p.m. |
PCard sweep for transactions loaded between November 3-November 14 |
5 p.m. |
• AR Invoices to be entered by Central Accounts Receivable must be received by AR at 1033 Massachusetts Ave., 2nd Floor to ensure posting prior to the Upgrade |
|
Fri., Nov. 16 |
12 p.m. |
• Last date/time for processing Stop Payment requests prior to the Upgrade |
4 p.m. |
Last date/time to post any new sponsored accounts in GMAS prior to the Upgrade. |
|
4:30 p.m. |
Manually entered invoices completed in Oracle AR by this date/time will be posted prior to the Upgrade |
|
5 p.m. |
• Invoices already in the AP system that come due for payment between November 19 - 23, 2012 based on payment terms, will be paid |
|
8 p.m. |
Normal HR data loads processed |
|
Fri., Nov. 16-Mon., Nov. 26 |
9 p.m.-6 a.m. |
• AP Feeds submitted should be given unique extensions so files are not overwritten |
Fri., Nov. 16-Wed., Nov. 23 |
9 p.m.-5 p.m. |
Credit Vouchers will continue to be received and deposited in the Bank. These transactions will be entered into Oracle after the Upgrade during the week of November 26th. |
Fri., Nov. 16-Mon., Nov. 26 |
9 p.m.-6 a.m. |
The Oracle E-Business Suite will be unavailable. The following applications will not be accessible during the Upgrade period: |
Sat., Nov. 17-Tues., Nov. 20 |
8 a.m.-5 pm |
CREW and Interactive Reporting for Financials, Student and Sponsored reflecting data as of Friday, November 16th, 5 pm available; Financials, Sponsored and Student reports reflecting data as of 5 pm, Friday, November 16th available in Interactive Reporting |
Sat., Nov. 17 |
8 a.m. |
CREW HR Reports and HR Interactive Reporting data available |
8 p.m. |
Normal HR Processing Load into Data Warehouse |
|
Sun., Nov. 18 |
8 a.m. |
CREW HR Reports and HR Interactive Reporting data available |
8 p.m. |
Normal HR Processing Load into Data Warehouse |
|
Mon., Nov. 19 |
8 a.m. |
CREW HR Reports and HR Interactive Reporting data available |
8 p.m. |
Normal HR Processing Load into Data Warehouse |
|
Tues., Nov. 20-Monday, Nov. 26 |
5 p.m.-8 a.m. |
CREW Financials, Sponsored and Student reports unavailable. CREW report outputs run prior to 5 pm will be accessible during this time period. Interactive Reporting application available, but access to financials, student and sponsored data unavailable as the databases will be locked |
Tues., Nov. 20 |
8 p.m. |
CREW HR reports unavailable; Interactive Reporting available but access to HR data unavailable as the database will be locked |
Wed., Nov. 21-Sun., Nov. 25 |
8 a.m.-8 p.m. |
CREW HR Reports and Interactive Reporting HR reflecting data as of Monday, November 19th, available |
Fri., Nov. 23 |
8 p.m. |
Data that has been fed into the Accounts Payable System, Accounts Receivable System, GMAS, and General Ledger between Saturday, November 17-Friday, November 23 will be processed through the data warehouse |
Sun., Nov. 25 |
8 p.m. |
HR Data Loads resume |
Mon., Nov. 26 |
6 a.m. |
Oracle E-Business Suite available and financial processes resume. |
8 a.m. |
Journal feed files, AP feeds and AR Feeds submitted during the upgrade will be reflected in the CREW and Ad Hoc reporting environments. CREW HR Reports and Interactive Reporting HR Data available as usual |
|
8 p.m. |
Resumption of Regular Nightly Load Schedule to CREW Financial, Sponsored, and Student Reporting, as well as Financial Ad Hoc reporting environments. |
|
Wed., Nov. 28 |
8 a.m. |
Any changes to CAPS forms (including budget detail) submitted after close of business (5pm) Friday, November 16 will be reflected in CREW. |
Tag; Oracle